Take the Recommended Steps

You will understand the roofing process better and be more satisfied if you take the time to read the following information and take the recommended steps. We do everything we can to complete your roof to your perfect expectations.

Before The Project
  • Attic Valuables: If decking will be replaced, protect items from falling debris by moving or covering.
  • Driveway Access: Please clear your driveway during work periods on the street.
  • Pictures and Shelving: Sometimes, items hung on walls or placed on shelves may fall due to the hammering vibration. Please place these vulnerable items in a safe place.
  • Exterior Clearance: Move patio/pool furniture, potted plants, gardening equipment, or any other items that may catch debris or restrict crew mobility.
  • Electrical Power: Check exterior electrical outlets to ensure they are in working order or run an extension cord through a window.
  • Attic Wires and Pipes: Please let us know of any wires or pipes that may have been installed since the home was built and may be within 2 inches of the roof decking.
During The Project
  • Shingle Delivery: Compare color and type with your contract. Call your Project Manager immediately if it is not what you specified.
  • Notify Your Mortgage Company: This will expedite the inspection and payment process.
  • Noise: You may want to make plans to be away from your home to avoid the constant hammering.
  • Children and Pets: The working area outside your home can be dangerous. Please keep the area clear of children and pets during the entire working period.
After The Project
  • Ventilation Pipes: After the roofing is completed, either you or our Project Inspector should check to ensure non have dislodged from their connection in the attic.